NORBURY WHARF LIMITED

NORBURY WHARF LIMITED
Shop front in the summer

Sunday, 28 August 2011

Bank holiday weekend...

I hope that you enjoyed reading Lorraine’s blog yesterday, she’s a real character and good fun to work with! You were meant to have it on Friday, but unfortunately our internet connection was playing up – I think I have fixed it now (fingers crossed).

We all had an extremely busy day yesterday with the hire boats turning round plus three dayboats, the holiday cottage and both motorhomes. It’s been a bit quieter today although we had three dayboats out again this morning and Summer Wine went out at about midday.

Matt has now finished painting La Valeria. I will get you some photographs when we bring her out of the dock tomorrow.

That’s everything from me today.

I’ll be back tomorrow.

Best regards,

David.

Saturday, 27 August 2011

A post from Lorraine

Hi it’s Lol here! David has asked me to do the blog today, against my will… I have been working here for 6 months on 1st September and it has been a very enjoyable, but eventful time…

Ange and Lorraine sporting some of our new stock.

I used to work on cruise ships – a slightly larger scale than narrow boats on the canal! In both jobs I have met great people and have had great working relationships with my colleagues. It was hard work on the cruise ships, especially at the height of the season but at the same time having a laugh too, I try to do the same here.

The very first time that I met the staff at Norbury was when I came clambering out of the canal like a drowned rat. Ange was the first to spot me as she was having her break on the Wharf. I had fell into the canal off of the front of my boat when we were pulling in for diesel. That wasn’t to be the last time either… The last time it was self inflicted! Too many beverages and not of the non alcoholic type either.

Have I mentioned that I don’t like water and that I never have? I can’t swim either. You may ask yourself “why has she sailed on cruise ships and work at the Wharf?” The reason is because I want to.

I was offered a job at the Wharf after falling in and this is my first blog as you have probably gathered.

Oh yes, my job role here apart from avoiding falling in the canal again consists of working in the tearoom, I clean the boats and have always got a mop in my hand. I also work on reception when needed or when Simon, David and Ange can put up with the numpty – yes that’s what Simon ‘the boss’ calls me, bless him! Other than that I generally float around (no I’m not on drugs haha) well I’ll go now as I need to clean the day boats and we are going home soon.

Luv Lol x

Friday, 26 August 2011

no internet, no blog :(

hi, we have tried honestly, we didn't even realise that the internet was down, too busy and it was gonna be so different today, you'll have to wait til tomorrow when we get it sorted, keep a look out, ange.

Thursday, 25 August 2011

Andari’s up, up and away

It rained hard during the night. That hard infact that it even woke me up at one point! By the time it was time to get up and take Annie dog out for a walk it had started to dry up and by the time I arrived at Norbury, the sun was starting to shine. It’s threatened rain a couple of times today, but until now it has held off. I hope that it continues to hold off all evening as I will be avidly watching Mikron’s performance of Hell and High Water at the Anchor this evening – I will hopefully see some of you there??

We had three day boats out again this morning which Graham saw to. Fred has been down in the depths of the dry dock blacking the two boats that we currently have on there and painting the counter bands. It certainly doesn’t make life easy for him having two boats on the dock as he has to climb over a bostock or two, but he does little grumbling – well what I hear anyway! Here’s a picture for you.

I’ve also got a couple more pictures for you all today. We had a haulage firm in to crane Andari out this morning as it has now moved to a different location. Here’s a picture of the driver setting up…

And another of the boat safely on the wagon.

We can arrange cranage, haulage and provide hard standing for any size of (narrow) boat at very competitive prices. You can drop us a line if you would like further information.

Graham hasn’t made much progress on the cabin job today as he has been down in the dry dock fitting anodes, replacing a bottom rudder bearing and doing some plating work. Bernard has been doing some work on Debdale and has also been on a breakdown to a private boat at Market Drayton.

Matt’s settling in to his new role as resident boat painter here at Norbury and he is getting on very well with the boat that he has got in the dock called La valeria. He should have her completed for the weekend. Here’s a picture to show you his work so far. I’ll get you another one when we slide her out of the dock on Sunday.

Ange and Lorraine have been busy in the tea room today, whilst I have been trying to catch up on emails and correspondence from customers and generally keeping a beady eye on the whole sit and generally keeping a beady eye on the whole site.

One last picture for today. Here’s a picture of the progress that Steve and Aaron have made up the moorings.

Becks rang earlier, she was descending the locks at Atherstone on Sovereign Lady when the engine faided away and eventually stopped. Luckily nothing serious, but she has learnt the hard way that the tank requires diesel in it! It's a good job that I have friends in that area to jump in and help us out (thanks Lol)... She's underway again now and is on a marathon to arrive back here for Saturday morning - give her a wave if you see her!

Have a good evening and I will be back again tomorrow.

Best regards,

David.

Wednesday, 24 August 2011

Mikron are in town.


Well the rain has held off for another day, although we did have a short sharp shower earlier today.

The Mikron Theatre Company has arrived aboard their narrowboat Tyseley and will be performing one of their spectacular acts tonight at the Junction Inn from 7.30pm onwards. If you haven’t seen them before it is certainly worth the effort to see them. They have got two more performances to do in this area; one at the Anchor tomorrow night and another at the Navigation Inn at Gnosall on Friday night. Full information can be found here – they need all the support they can get, so if you are lost for something to do over the next couple of evenings, please make the effort to see them.

Here’s a picture of Empress and Tyseley tied in the basin at Norbury this morning.

Talking about this morning, we had three day boats out again. We have also docked two boats for pressure washing and blacking and have been on numerous jobs on boats and around the site.

Graham is making progress with the cabin job, although he has had to do some welding inside a water tank today – lovely job!

Ange and Lorraine have manned the shop, office and tea room. It hasn’t been manic with boats on the wharf, but it has certainly kept us busy.

That’s everything to report from Norbury today. Let’s hope the rain holds of again tomorrow J. Although saying that from the restriction notices that I have just received from British Waterways we should all be performing a rain dance as it looks like we have only 7-8 weeks worth of water in the reservoirs before they are run dry.

Regards,

David

Tuesday, 23 August 2011

The Met Office

Well the Met Office definitely got the forecast wrong for today, although it seems that everywhere in the UK except from Norbury seems to be experiencing heavy rain… It has been a glorious day and as I write the sun is beating down, making it look like it will be a pleasant evening.

We had a really good music session at the Anchor last night and along with good company a great night was had by all.

We initially were sending two day boats out this morning, but by 9am we had booked Phantasy out too. They all had a good day and also appreciated the good weather.

Fred and Bernard have been up to their normal daily duties whilst Mick has fitted a Houdini hatch and has been starting to wire up the engine that Bernard finished fitting yesterday into a private boat. Steve and Aaron are making good progress with the moorings, we have just loaded the day boat with more wood for the path!

There is not much more to report from sunny Norbury.

Until tomorrow…


Regards,

David

Monday, 22 August 2011

It's Monday!

My Mum and Dad brought the Ant down from Wheaton Aston yesterday and we went upto the Anchor last night for a rendezvous. Sue joined us with Thea and Michael came over for the evening. A good night was had by all!

Sue, Michael and I left the Anchor early this morning as the mist was rising off of the canal. A sure sign of a good day to follow. The cutting can be a bit eerie that time in the morning, but I was on tea duty whilst Sue daggered back… After breakfast Michael headed back to London (hopefully he didn’t get caught in the V festival traffic) and Sue’s now headed off to the Chesterfield Canal.

It’s been a busy day again today. Busier than an average Monday, with a couple of private breakdowns, normal services on the wharf and the day-to-day chores. The weather has kept fine, although rain has been promised L

Bernard has been in today to make headway on the engine that he has been fitting and Graham has been doing some welding and fabrication jobs on a couple of boats.

That’s it from me today.

Catchya tomorrow.

Regards, David.